July 1944 Tower Log Entries
306th Bomb Group--Thurleigh, England

Tower Logs were maintained in the Control Tower for every day of operations during the war. Valuable information regarding weather, general field conditions, and mission takeoff and landing details are included. The logs have been scanned one day at a time (see below). Click on a date below to download a pdf of the pages in the Tower Log for the date desired.

Be patient--some of these files are large and will take some time to download.
\
1 July 1944 2 July 1944 3 July 1944 4 July 1944 5 July 1944
6 July 1944 7 July 1944 8 July 1944 9 July 1944 10 July 1944
11 July 1944 12 July 1944 13 July 1944 14 July 1944 15 July 1944
16 July 1944 17 July 1944 18 July 1944 19 July 1944 20 July 1944
21 July 1944 22 July 1944 23 July 1944 24 July 1944 25 July 1944
26 July 1944 27 July 1944 28 July 1944 29 July 1944 30 July 1944
31 July 1944